Duo Towers in “Full BIM”
Developed by Ivanhoé Cambridge and Natixis Assurances and envisioned by Jean Nouvel, the Duo Towers are one of the first high-rise operations conducted in “Full BIM.”
The Sustainable City Simulator
The Santiago Deseado simulator emerged from the French government’s aspiration to develop a global offering of “”living well in the French city.”” Financed by the Private Sector Study and Assistance Fund (Fasep) for two million euros, it led to an unprecedented digital development of urban simulation.
Deployment of a Multi-Campus WIFI Solution
NEOMA Business School is an innovative business school with campuses in Reims, Rouen, and Paris. Its mission is to educate students, business leaders, and entrepreneurs, and to generate knowledge to shape the future of businesses and society in a global, sustainable, and connected world.
Gélitra – the solution that simplifies your construction site
No one tolerates the supply disruptions and associated nuisances of urban construction sites anymore.
However, looming over several decades are the massive construction projects in our cities aimed at building renovations, adapting to climate change, and embracing the revolutions in new uses and mobility.
Operational maintenance of an information system
For over 70 years, Chryso has been leveraging its chemical expertise to serve professionals in the construction and civil engineering sectors around the world. The additives and additives they design and manufacture contribute to enhancing the performance of construction materials (concrete, cement, plaster). The operational maintenance of Chryso’s information system has been entrusted to Artelia, capable of addressing all of these needs.
Consulting and Support for Digital Hospital at the New Princess Grace Center (Monaco)
To adapt to the advancements in medicine and hospital techniques, the government of the Principality of Monaco has undertaken the construction of the new Princess Grace Hospital Center. With 394 beds, it incorporates the latest innovations in healthcare facilities, and consequently highly-developed digital services.
Virtual Reality Immersion in Mock Facilities
In order to reduce the carbon footprint of the project and its economic impact on the client, our teams have devised an intelligent solution to bypass the conventional construction of full-scale mock facilities, typically employed in various healthcare facility projects.